Electronics assembly fails on contamination and power quality long before it fails on floor area. The building is a yield decision.
Cleanliness is the constraint, not space
Electronics assembly fails on contamination and static long before it fails on floor area. A reflow line in a dusty bay produces solder defects that no amount of rework recovers economically. This is the sector where the finish of the building matters more than its size — and where a general-purpose shed most often disappoints.
The practical implications are specific. Floors need to be sealed and anti-static in the assembly zone. Air handling matters more than in almost any other light-manufacturing sector. And power quality — not just power availability — determines whether your pick-and-place machines run or trip.
The demand picture
India's electronic goods exports reached US$ 38.56 billion in FY25, up 20.4% year on year, and had already reached US$ 47.98 billion by August 2026 in FY26. The ESDM sector is expected to compound at 20–25% a year over the next five years, against a stated manufacturing output target of US$ 500 billion by 2030.
What matters for an MSME is where that growth localises. Mobile assembly concentrated near a handful of large campuses; the component and sub-assembly layer beneath it — enclosures, cable assemblies, PCB assembly, magnetics, connectors, moulded parts — is far more dispersed, and far more accessible to a first factory.

A named thrust sector
Thrust-sector status is what unlocks the capital investment subsidy under the 2026 policy. It is worth confirming your product classification early — it changes the arithmetic.
What to specify
Sealed, anti-static flooring
Bare concrete sheds particles continuously. In an assembly area that is a yield problem, not a housekeeping one. Epoxy or equivalent sealing with defined ESD properties in the assembly zone is the baseline.
Clean, stable power
Placement machines and reflow ovens are sensitive to sag and interruption in a way that a lathe is not. Metered supply that lets you see your own quality of power, plus properly sized backup, is worth more here than raw sanctioned load.
Separated goods flow
Incoming components, work in progress and finished goods should not cross. That is a layout decision constrained by where your doors are — which makes it a building decision, taken before you sign.
| Zone | What it needs | Why it matters |
|---|---|---|
| Assembly | Sealed anti-static floor, controlled dust | Directly determines first-pass yield |
| Reflow / wave | Extraction, stable three-phase supply | Thermal profile drifts with supply instability |
| Component store | Humidity-controlled, segregated | Moisture-sensitive devices have shelf lives |
| Test & inspection | Stable temperature, low vibration | Measurement repeatability |
| Despatch | Separate door from goods-in | Prevents mixed and cross-contaminated stock |
Where the policy sits
Electrical, Electronics & Scientific Instruments is thrust sector 04 of the nine named in Haryana’s Progressive MSME & Export Promotion Policy 2026, notified on 29 July 2026 in supersession of HEEP 2020 and the MSME Policy 2019. Thrust-sector status is what unlocks the capital investment subsidy; sectors outside the list can still claim the infrastructure and employment provisions, but not that one.
The bigger change is how location is graded. The 2026 policy sets the rate by the status of the land rather than by how developed the district is — four categories, Core through Prime/Focus. Our industrial parks fall in Prime/Focus, the top band: 30% capital investment subsidy up to ₹4 crore, a 100% stamp duty refund on the land, 70% of Net SGST reimbursed for seven years, and 7% interest subsidy on term loans up to ₹25 lakh a year. The full schedule is here.
One line worth reading twice: total incentives for any single project are capped at 100% of fixed capital investment. The schemes stack, but not without limit.
Where an electronics unit lands in Bhiwani
Electronics is a finish-and-power business. GT Realty meters every utility so your consumption and your supply quality are visible, and builds to suit where sealed floors, extraction and zone separation need designing in rather than retrofitting.
Frequently asked
Can a shed floor be made anti-static?
Is power quality different from power availability?
Does electronics qualify for the capital subsidy?
How much space does a first assembly line need?