Industrial plots and sheds built to your requirement, about 150 km from Panipat — on planned land with power, roads and drainage in place, inside the area we expect to qualify for Haryana’s Prime/Focus incentive category.
Panipat is the textile-recycling capital of the world and one of India’s largest home-furnishing export clusters, with the IOCL refinery feeding a downstream petrochemical trade. Its units are water- and power-hungry, labour-dense and export-oriented. The cluster’s strength is also its constraint: land inside Panipat is fully committed, and processing units face tightening limits on where they can operate.
Textiles and home furnishings, recycled yarn, dyeing and processing, petrochemical downstream.
A yarn, weaving or finishing unit can sit in the Hisar–Bhiwani cotton belt, 90 minutes from Panipat, with the raw material on the doorstep and room to build the shed it actually needs.
| Park | Road distance | Drive | On | Best for |
|---|---|---|---|---|
| Unity Industrial City | ~150 km | ~2 h 45 min | the Hisar–Tosham road (31 km from Hisar) | units serving Hisar, workshops and service trades for the stone belt, agro and textile ancillaries |
| Prestige Smart City | ~160 km | ~2 h 55 min | the proposed Hisar–Rewari highway | precision engineering, electronics, pharma and medical devices, FMCG, units moving out of NCR |
| Auron Industrial Park | ~190 km | ~3 h 25 min | NH-52 (100 m off the highway) | heavy and medium engineering, fabrication, auto components, warehousing on a highway |
| Orbit Industrial Park | ~200 km | ~3 h 40 min | the Bhiwani–Bahal–Rajgarh road | ready-to-occupy units, regional distribution, last-mile hubs, Rajasthan-facing businesses |
The usual route: Panipat → Jind → Hansi → Hisar, then on to Unity or Auron; or Panipat → Rohtak → Bhiwani for Prestige.
Distances are approximate road figures derived from straight-line measurements (×1.25, rounded to 10 km); drive times assume typical highway speeds. Confirm against your own route before planning a visit.
Unity Industrial City: developing; plots and sheds available. Plots, sheds built to your requirement, built-to-suit; rent, lease or sale. Prestige Smart City is the alternative at about 160 km.
| Distance to | From Panipat | From Unity | Change |
|---|---|---|---|
| Delhi | ~110 km | ~170 km | 60 km farther |
| Hisar | ~150 km | ~40 km | 110 km closer |
| Jaipur | ~370 km | ~280 km | 90 km closer |
| Rohtak | ~80 km | ~90 km | about the same |
| Bhiwani | ~130 km | ~30 km | 100 km closer |
Your customers, your Panipat office, your bankers and your family where they are. Unity is ~2 h 45 min from Panipat — a plant visit is a day trip.
Planned land with sanctioned power, metalled roads and drainage; a shed built to your own requirement at 8 m clear height; built-to-suit on lease if you would rather keep the capital for machinery; and a cost base set by West Haryana, not by Panipat. Our parks are located in areas we expect to qualify for the Prime/Focus category under the Haryana Progressive MSME & Export Promotion Policy 2026 — up to 30% capital investment subsidy (capped at ₹4 crore), 100% stamp duty refund and 70% Net SGST reimbursement for seven years. The category applicable to a specific plot is confirmed in writing before allotment. Full schedule.
| Item | Position |
|---|---|
| Land use | Outside the DTCP controlled area — no CLU required. No-objection confirmation on file. |
| Project status | MSME-approved project |
A textiles and home furnishings unit from Panipat is sized around its machine list and connected load, not the other way round. Send the list; we come back with a plot size and a shed footprint.
See the park, the road, the power infrastructure and a working shed at Orbit. Bring your CA or project consultant; the incentive paperwork starts with them.
Buy the plot and build; have the shed built to your requirement; or take a built-to-suit on lease and keep the capital for machinery.
Title documents, the no-CLU confirmation and the park approvals are shared at this stage. Incentive applications follow the scheme guidelines once your unit is registered.
Fourteen sector guides cover siting, specification and the 2026 policy position for each industry. All guides →
Dyeing and finishing need an effluent treatment plan of their own at any location, and we ask for it at the enquiry stage. Spinning, weaving, recycling and finishing-free conversion need far less water and are the easier fits. Tell us the process and the daily discharge and we will say plainly which park can take it.
About 150 km by road, ~2 h 45 min in normal traffic, via Panipat &rarr. The other parks are listed in the distance table above.
Incentives follow the unit’s location, not the owner’s origin. A new unit at a GT Realty park applies under the Haryana Progressive MSME & Export Promotion Policy 2026; the applicable category for the specific plot is confirmed in writing before allotment. See the schedule.
No. All four parks are outside the DTCP controlled area, so no change-of-land-use permission is required; the no-objection confirmation is on file and shared at allotment.
Tell us the product, the power and the timeline — we come back with a plot size, a shed footprint and a date to see Unity.