Industrial plots and sheds built to your requirement, about 120 km from Sirsa — on planned land with power, roads and drainage in place, inside the area we expect to qualify for Haryana’s Prime/Focus incentive category.
Sirsa and Fatehabad are Haryana’s cotton and kinnow belt, with ginning, pressing, milling and agri-machinery trades. The districts produce more raw material than they process. An owner here looking to add value — spinning instead of ginning, packing instead of trading — typically finds that the nearest planned industrial land with reliable power is on the Hisar side.
Cotton ginning, kinnow and agri-processing, rice milling, agricultural machinery.
Auron on NH-52 is the natural step up the value chain for a Sirsa or Fatehabad processor, on the road that already carries the cotton.
| Park | Road distance | Drive | On | Best for |
|---|---|---|---|---|
| Auron Industrial Park | ~120 km | ~2 h 10 min | NH-52 (100 m off the highway) | heavy and medium engineering, fabrication, auto components, warehousing on a highway |
| Orbit Industrial Park | ~140 km | ~2 h 35 min | the Bhiwani–Bahal–Rajgarh road | ready-to-occupy units, regional distribution, last-mile hubs, Rajasthan-facing businesses |
| Unity Industrial City | ~140 km | ~2 h 35 min | the Hisar–Tosham road (31 km from Hisar) | units serving Hisar, workshops and service trades for the stone belt, agro and textile ancillaries |
| Prestige Smart City | ~150 km | ~2 h 45 min | the proposed Hisar–Rewari highway | precision engineering, electronics, pharma and medical devices, FMCG, units moving out of NCR |
The usual route: Sirsa → Hisar on NH-9, then NH-52 to Siwani: about two hours.
Distances are approximate road figures derived from straight-line measurements (×1.25, rounded to 10 km); drive times assume typical highway speeds. Confirm against your own route before planning a visit.
Auron Industrial Park: roads and services under construction; plots available, sheds built to requirement. Industrial plots, sheds built to your requirement, built-to-suit; rent, lease or sale. Orbit Industrial Park is the alternative at about 140 km.
| Distance to | From Sirsa | From Auron | Change |
|---|---|---|---|
| Delhi | ~290 km | ~200 km | 90 km closer |
| Hisar | ~100 km | ~50 km | 50 km closer |
| Jaipur | ~380 km | ~270 km | 110 km closer |
| Rohtak | ~210 km | ~130 km | 80 km closer |
| Bhiwani | ~170 km | ~70 km | 100 km closer |
Your customers, your Sirsa office, your bankers and your family where they are. Auron is ~2 h 10 min from Sirsa — a plant visit is a day trip.
Planned land with sanctioned power, metalled roads and drainage; a shed built to your own requirement at 8 m clear height; built-to-suit on lease if you would rather keep the capital for machinery; and a cost base set by West Haryana, not by Sirsa. Our parks are located in areas we expect to qualify for the Prime/Focus category under the Haryana Progressive MSME & Export Promotion Policy 2026 — up to 30% capital investment subsidy (capped at ₹4 crore), 100% stamp duty refund and 70% Net SGST reimbursement for seven years. The category applicable to a specific plot is confirmed in writing before allotment. Full schedule.
| Item | Position |
|---|---|
| Land use | Outside the DTCP controlled area — no CLU required. No-objection confirmation on file. |
| Project status | MSME-approved project |
A cotton ginning unit from Sirsa is sized around its machine list and connected load, not the other way round. Send the list; we come back with a plot size and a shed footprint.
See the park, the road, the power infrastructure and a working shed at Orbit. Bring your CA or project consultant; the incentive paperwork starts with them.
Buy the plot and build; have the shed built to your requirement; or take a built-to-suit on lease and keep the capital for machinery.
Title documents, the no-CLU confirmation and the park approvals are shared at this stage. Incentive applications follow the scheme guidelines once your unit is registered.
Fourteen sector guides cover siting, specification and the 2026 policy position for each industry. All guides →
Auron sits on NH-52, the road the cotton already travels to Hisar’s spinning trade. A spinning unit needs a 6–8 m shed, stable power and dust management; the shed is built to that specification on your plot.
About 120 km by road, ~2 h 10 min in normal traffic, via Sirsa &rarr. The other parks are listed in the distance table above.
Incentives follow the unit’s location, not the owner’s origin. A new unit at a GT Realty park applies under the Haryana Progressive MSME & Export Promotion Policy 2026; the applicable category for the specific plot is confirmed in writing before allotment. See the schedule.
No. All four parks are outside the DTCP controlled area, so no change-of-land-use permission is required; the no-objection confirmation is on file and shared at allotment.
Tell us the product, the power and the timeline — we come back with a plot size, a shed footprint and a date to see Auron.